Piping Fabrication Workflow for Oil & Gas and Industrial Projects
Three completed carbon steel spools were pulled from the dispatch queue at a Sharjah piping fabrication shop in early 2026, two days before their scheduled site delivery. Every weld had cleared radiographic testing. The hold was not for quality: heat numbers had not been transferred from the parent pipe lengths to individual cut pieces before